Mumbai
Participants | |
---|---|
Owner | Mahanagar Gas Limited |
Constractor | Whiteland Engineering |
Location of the Job Site | Mumbai |
Tender | |
Short Description of Job | Underpass of railroad for gas supply line, steel pipe 457 mm |
Specifications for Tenders | Drilling a 457 mm pipeline underneath several rail traks in a depth between 3 to 4 m, length of the drill 74 m |
Alternative Methods proposed by the Constructor | Pulling Pipe Method |
Ground conditions | |
Described Ground in the Ground Report | Compact basalt and partially fragmented rock |
Encountered Soils | Compact basalt and partially fragmented rock |
Depth of Coverage | 3,8 m underneath the rail tracks |
Accuracy | Vertical approx. 100 mm, horizontal approx. 400 mm |
Time for Job or Production Rate | 6 days inclduing setup and removal of the equipment |
Driving Length | 74 m |