Montreal

Participants
Owner Kiewit Montreal
Constractor ForAction Inc. Forage Horizontal, Mont-Saint-Hilaire QC
Location of the Job Site 7350 Boulevard Sainte Anne-De-Bellevue
Montreal, QC H4B1T4
Tender
Short Description of Job Crossing underneath the Boulevard Sainte-Anne-de-Bellevue
Specifications for Tenders Crossing underneath the Boulevard Sainte-Anne-de-Bellevue, length of the drive 106 m, ground: refilled material with boulders, bricks and concrete
Alternative Methods proposed by the Constructor Guided drill using Front Steer with DTH hammer
Ground conditions
Described Ground in the Ground Report Refilled material with boulders, bricks and pieces of concrete
Encountered Soils Silt, loose sand, stones, boulders, bricks and pieces of concrete
Depth of Coverage 5 m below surface of the boulevard
Accuracy ±25 mm in each direction
Time for Job or Production Rate Production rate 5 m per hour, total time over all: 2 weeks
Driving Length 106 m
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal
Baustelle von Bohrtec Gesellschaft für Bohrtechnologie mbH in Montreal

Bohrtec Gesellschaft für Bohrtechnologie mbH
Konrad-Zuse-Straße 24
D - 52477 Alsdorf
+49 (0) 2404 9881 - 0
+49 (0) 2404 9881 - 10
info