Montreal
Participants | |
---|---|
Owner | Kiewit Montreal |
Constractor | ForAction Inc. Forage Horizontal, Mont-Saint-Hilaire QC |
Location of the Job Site | 7350 Boulevard Sainte Anne-De-Bellevue Montreal, QC H4B1T4 |
Tender | |
Short Description of Job | Crossing underneath the Boulevard Sainte-Anne-de-Bellevue |
Specifications for Tenders | Crossing underneath the Boulevard Sainte-Anne-de-Bellevue, length of the drive 106 m, ground: refilled material with boulders, bricks and concrete |
Alternative Methods proposed by the Constructor | Guided drill using Front Steer with DTH hammer |
Ground conditions | |
Described Ground in the Ground Report | Refilled material with boulders, bricks and pieces of concrete |
Encountered Soils | Silt, loose sand, stones, boulders, bricks and pieces of concrete |
Depth of Coverage | 5 m below surface of the boulevard |
Accuracy | ±25 mm in each direction |
Time for Job or Production Rate | Production rate 5 m per hour, total time over all: 2 weeks |
Driving Length | 106 m |